The first approach
Notice the threshold prominent in this photo. This was taken on the inspection day.
Where they meet
Where the driveway and the walkway meet, it was unlevelled causing another tripping hazard.
View from up top
Top of the property looking down.
Walkway before
The front walkway before the lifting process.
Preparation
The drill holes were in place, now it is time to inject our high-density polyurethane in the concrete to fill the voids underneath and lift the driveway to match the threshold.
Final look
The injections are in and the threshold is minimized. No more tripping in and out of the garage.
Steps are all set
The gap is minimal thanks to our PolyLevel®.