The Whitby, Ontario, fire station needed our help to eliminate a tripping hazard on the parking lot's perimeter. The concrete walkway leading into the building had started to sink two inches, making it dangerous for the staff to come and go from their vehicles. During the harsher winter days, the hazard became completely invisible, which made our new clients want the problem solved as soon as possible. Based on the tremendous work we've previously done for the town of Whitby, the fire hall knew they could trust Canadian Concrete Leveling to do a quick yet professional job.
Our Project Manager, Kyle O'Brien, came to the rescue and started his investigation of the sinking concrete. He can see that the walkway needed a healthy amount of our PolyLevel® injection material to stabilize the undersoil and lift the walkway back to its original height. With the go-ahead from the fire station, the job was scheduled to be completed. Our experienced installer, Bill McKeown, began the work and wanted to get it done promptly. So before the firefighter's next call, the concrete was levelled and cured. No interruptions and, most of all, no more hazards.